Construction steps for optical cable engineering
Sections are included for project management; cable handling, testing and equipment; overhead cable placement; underground cable placement; underground enclosures; bonding and grounding; cable preparation and connectorization; splicing; and activation and testing. These systems are critical to ensuring robust and high-speed communication networks. A fiber optic project begins with a need for communications and ends with an installed fiber optic cable plant and an operating network that fills that communications need. Between those two points are a number of stages: Each of these stages breaks down into many smaller projects with one thing in.